Ideal Floor Plan for Data Center

Floor Planning of a Data Center is as much importantaisle set up is executed. In this kind of set up air is
as other factors like power supply and cooling. All thedelivered via perforated tiles. Heat generated in the
equipments should be placed in a managed manner toHot aisle is transferred to the CRAC units using ceiling
modify the cooling and air flow without disturbing theheight. Many parts in the Data Center are low density
working environment and still providing 100%RLU zones which need only raised floor cooling
accessibility and scalability. Planning the floor plans foroptions others, there are some areas which need
a  Data center is not a Childs job and need perfectmedium density cooling and ultra high density server
assessment of top down and elevation approach.needs cabinet cooling solution.    
The whole plan starts with planning and pre-designingElevation View
in order to create an capable Data Center floor. IfThree most important Data Center floor plans are
you invest at this point it will save you a lot of timelayout above raised floor, layout below raised floor
in the future. Before jumping into the serious businessand layout above dropped ceiling. Designers begin
you should figure out your budget needed for thewith dividing the floor. At this step a sub floor which
equipment wanted in the computer rooms, electricalcan be used  as a drainage system used for remove
rooms and mechanical rooms. Only after confirmingpossible leaks from sensible equipments. Even the
the above steps real construction work begins. Twocooling pipes and Power cables must go through sub
most common and important methodologies used infloor. Data Cables are installed at the top of the
floor planning of Data Center are :            raised floor. Some free space should be included in
Top Down View    the raised floor for undisturbed flow of air. Ceiling
Deciding equipment size, equipment location, workheight should be more than 9 feet and all the
flow process and essential space area these factorsequipment should be placed at least 18 inches away
should be examined by the designers. Designersfrom the ceiling.   
used  Computational Fluid Analysis (CFD) using it onNext layout is above the dropped ceiling. Plumping
the area below and above the floor. Technicians seekand water should be strictly banned from passing
help from CFD to find out where to place perforatedover the room. Most suggestible is to avoid these
tiles, Computer equipment, CRAC equipment and rackpipes in the building and place them somewhere in the
location units. To facilitate hitches in both under andperimeter. This will reduce the possibility of water
over airflow various kind of software’s are usedleak which can done serious damage to the computer
in the process. Which part of the Data Center shouldequipments. Dropped ceilings presents an optional
be used for high, low and medium density of thecooling by allowing the air to flow through ceiling
equipments is also decided by the use CFD. Onlyplenum based on the requirements of the cooling.
when all the above steps are confirmed Hot and Cold